Laserfiche WebLink
3 <br />• • <br />Ms. Carol Pahlke <br />Mined Land Reclamation <br />April 30, 1979 3 <br />(6) Rock faces of the Fox Hills will not be revegetated. <br />(7) (a) The Estimated Reclamation Timetable shows 2.17 acres will be backfilled <br />and graded. This is the pit area other than the Fox Hills rock. <br />Obviously, 12.59 acres will have to be smoothed, soiled or not soiled, <br />and revegetated. If you wish to classify this as regrading, please <br />advise. The difference of 0.41 acres between 12.59 acres and 13.00 <br />acres is the rock face. <br />(b) Same problem. <br />(8) No. Only on Board demand. <br />(9) The operator greatfully accepts the suggestion of the Mined Land Reclamation <br />staff. We shall adopt the mixture into our plan. We deeply appreciate the <br />staff accepting the responsibility for growth. <br />(10) We accept the suggestion as to fall seeding. Please designate dates. <br />(11) Comment noted. <br />(12) The staff's usual recormnendation is western wheatgrass. If that is no <br />longer acceptable, please specify an alternative. <br />(13) Roughing is a natural occurrence in a backfill. We see no problems with <br />soil stability. <br />(14) We are not sure how to control the weeds. Please advise best procedure. <br />We do not wish to exterminate existing natives. <br />Exhibit G <br />(1) Mining in Stage I will commence approximately 100 feet north of Church <br />ditch. We do not believe this excavation will adversely affect the <br />stability of either ditch. This is a normal ditch setback. Unless the <br />Board rules otherwise, nothing further will be submitted. <br />(2) Any move of either ditch will be covered by an addendum to the application. <br />(3) Nonsense. Consult C.G.S. <br />(4) No water has been encountered. <br />Exhibit .I <br />03' Thy ~p ~ TL l <br />(1) idot unless demanded by Board. [de aie willing to accept the report of the <br />SC6.~ Refer to Rules b Regulations 2.12(9). <br />