Laserfiche WebLink
<br /> <br />Colorado Mined Land Reclamation Board 4 <br />October 3Z, Z980 <br />No. ZO Issue -Anticipated final topography after reclcanat/ion. <br />See contours Located on Exhibit F Reclamation Plan .Map. v <br />No. ZZ Issue - Location and extent of natural vegetation. <br />Please refer to the June 20, 2980 letter from Mr. Carrot Hcnnon,SCS, <br />(Attachment E), which was included in the original application. Exhibit ' ~ <br />C also describes existing vegetations. Additional cononents from C¢rrol HamonJ~ ,~ e <br />with .more specific site information are forthcoming and will be forwarded <br />to you when received. '~ r r , <br />-, tt. <br />No. Z2 Issue - Reclamation of parking areas. '~' <br />The attached sketch shows the typical stockpile and equipment layout <br />which will include parking around the crusher. In nearly all cases, <br />the compacted parking and plant areas will be removed during the mining ~/ <br />process. Areas that are not removed shall be ripped prior to topsoilingY <br />and reclamation. (Attachment F) <br />No. Z3 Issue - RecZomattion procedure <br />AZZ lands within the proposed permit area will be reclaimed to a wildlife <br />habitat. Of the total area, approximately 78 percent will be reclaimed <br />to pond areas. The remaining area will consist of screening mounds, <br />protective berms, access roads, parking areas, walkways, and habitat <br />cover areas between ponds. Overburden and screening fines will be used <br />to construct the Zand forms. Once they are constructed to their desired <br />configurations, a minimum of six inches of topsoil will be replaced on <br />aZZ Zand areas. The ground will be tilled to remove air pockets. Soil <br />tests will be performed to determine the need for and amount of fertilizers <br />and soil amendments. Fertilizers will be incorporated by discing or <br />other appropriate meassrres. Seeding rates have been specified in the re- <br />sponse to Issue No. 4. In addition to seeding with the specified grass <br />mixture, cottonwoods and willows will be transplanted along the shorelines <br />of the screening mounds. The cottonwoods shall be placed at 25 to 50 foot <br />spacings with willow shoots placed among the cottonwoods at approximate <br />6 to ZO foot spacings. During the period Stage I is mined, screening <br />mounds and protective berms will be constructed with overburden and <br />screening fines. The dividing areas between ponds will also be constructed <br />concurrently with mining. During the latter years of Stage I mining, <br />topsoil from Stage II will be stripped and replaced at appropriate <br />locations for Stage I reclamation. Once the topsoil is removed from Stage <br />II mining will connnence, along with concurrent construction of ponds, mounds, <br />and berms. The same general timing will apply to Stages III and IV. <br />No. Z4 Issue - Requirement for recZmnation guarantee by the County. <br /> <br />See Weld County letter dated October 22, 2980 previously submitted to <br />the Board <br />