Laserfiche WebLink
TABLE 1 <br />Water Monitoring Plan <br />WRN personnel will sample the wells with dedicated samplers from completion zone. <br />Nitrogen gas will be utilized to air lift the water. Samples are obtained after at least <br />one evacuation of the sample zone to obtain a fresh aquifer sample. Field <br />measurements will be noted throughout evacuation (first cycle) and subsequent cycle(s) <br />to determine when water quality stabilizes and therefore when to obtain the sample. <br />Field Measurements (Montldyl by WRN. Sam <br />ples - 1 <br /> •_ <br />conductivity pH temperature <br />Lab Analysis - Major Components by Contract La b. Sample - 2 <br /> <br />TDS alkalinity sodium silica pH chloride <br />potassium bicazbonate magnesium fluoride conductivity carbonate <br />calcium sulfate boron strontium hazdness <br />Minor Components (Sample initially and annuallxl by Contract Lab. Sample - 3 <br />azsenic aluminum cadmium COD <br />manganese selenium barium SAR in water <br />chromium nickel vanadium <br />beryllium copper lead <br />molybdenum mercwy bromide <br />zinc nitrate as N nitrateJnitrite as N <br />lithium nitrogen, total kjeldahl nitrogen, ammonia <br />iron total phosphorus nitrite as N <br />Cation-anion balance <br />25 <br />