My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72652
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:12 PM
Creation date
11/21/2007 12:22:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998024
IBM Index Class Name
Permit File
Doc Date
3/27/1998
Doc Name
Permit Application
From
B & B Excavating Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN • • <br />Description of Concurrent Mining and Reclamation Opgrations <br />Step i -Install proper road signage for the operation. <br />EXHIBIT D )coot) <br />Step 2 -Hay bales, ditches and sumps will be installed at the lowest point of the access road near the <br />intersection with Coffee Pot Road since this portion of the road will not drain to the sediment pond. <br />Step 3 -All topsoil material will be stripped from an area of approximately 15 acres at the southern <br />portion of Stage A as shown on Map Exhibit 5 of the County permit. The soil will be stored along <br />the western and northern boundaries of the 29.2 disturbed area. Scrapers or loaders and trucks will <br />be used to strip the soil. <br />~ Undisturbed <br />M~n~m. ~ ~'~;-~ Slope <br />~~ <br />fir; ~„ <br />Pit Area , <~ <br />~~ <br />40'Height ~~, -,~ ~1 <br />2HdV inside dope ~~ ,~ ~ <br />cut by opcratioa ~~ ~~ <br />~~ i' <br />it <br />~) <br />Cross-Section of Berm Excavation <br />Step 4 -The excavation of gravel will <br />begin approximately 10' to 50' from the <br />southeast comer of the terrace. This <br />setback will become the top of a sight <br />berm that will be left in place during the <br />life of the mine. Mining will progress <br />on this initial stripped area until a hole <br />approximately 40 feet deep has been <br />created and a face stretching the width <br />of the stage is complete. The inside of <br />the berm will be cut from existing g- <br />round to an inside slope of 2H:1 V, leav- <br />ing al] pinon and juniper tress on the outside, undisturbed slope of the berm. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.