Laserfiche WebLink
CRYSTAL PIT <br />WASTE MATERIAL HANDLING: It is not anticipated that any waste <br />• material will be produced in the course of the operation as no <br />processing of the material is anticipated. However, if screening is <br />done on site Cno crushing will be used) then the waste material will <br />be utilized as a fill and incorporated into the surface during the <br />grading process. <br />FINANCIAL WARRANTY AND RECLAMATION COSTS: Although it is felt that <br />reclamation of this site will be relatively inexpensive, it is agreed <br />that a financial warranty of X5,000 (the maximum permitted by law) <br />will be provided to protect the state and insure that reclamation will <br />be implemented. <br />• <br />• <br />20 <br />