Laserfiche WebLink
Stipulation No. 13 <br />THE DIVISION REQUIRES THAT FENCING SHALL BE ACCOtQPLISHED <br />WITHIN THE CONFINES OF THE PERMIT AREA TO PREVENT GRAZING <br />OF REVEGETATED AREAS FOR A TIME NOT LESS THAN THREE YEARS <br />• AFTER THE INITIAL SEEDING. INFORMATION FROM THE MONITORING <br />PROGRAM TO BE CONDUCTED WILL ALLOW THE DIVISION TO DETERMINE <br />WHETHER TO ALLOW GRAZING AFTER THAT TIME. <br />Northern Coal's Answer: <br />THE ENTIRE PERMIT AREA HAS BEEN FENCED FOR THE NORTHERN <br />N0. 1 MINE, REFUSE DISPOSAL AREA, AND THE SEDIMENT POND <br />AREA AT THE RIENAU N0. 2 MINE. THE WILSON-LOUDY LOADOUT <br />PERMIT AREA WILL BE FENCED AS SOON AS WEATHER WILL ALLOW <br />IN THE SPRING OF 1985. THE RIENAU N0. 2 MINE SITE WILL <br />BE FENCED AT SUCH TIME AS RECLAMATION WOULD BE COMPLETED. <br />,• <br /> <br />H1-~t5 <br />~~ ~~~ <br />