Laserfiche WebLink
. ~ to u n•USAM massey- 3034267780 ;# 4/ 7 <br />auvi nT•mss ~ ~ <br /> <br />_lZ_ I <br />The buttress Itself wi11 be eanstructedlof durable rotk materials wnich <br />is the waste material from the pft area. !tits designed as a free drainfng <br />structure and, to facilitate that, a filter fabric will be pt aced between the <br />buttress materials and the highwall to ensure that there would not be buildup <br />of head on the highwaTl side xhich xould coca romise the integrity of the <br />buttress. The overall taetor of Safety for ~he south wa11 with me buttress <br />in place is increased W about 1.8. That's fi~lIver the long term, <br />Regarding the slurry wall, t need to mak~a a correction iota the record as <br />is xhat we xere referring to this as last month. We referred to it the record <br />as a grout curtain and iTere's a difference between a grout curtain ana a <br />slurry wail. The proposal, we11, the Laapany;coamitment at thls point, would <br />be to install a slurry wall at the sits ad,iaclnt to the Rito Se co alluvium in <br />the vacinl>~y of the south watt of .the West pit. The ac trial purpose of the -- <br />the actuai proposal is to build a south wall mr the slurry wall so as to <br />inhibit aqy inflows of alluvial waters from rile Rita Seto alluvium tote the <br />South Pft or the West Pit, I'm sorry. ' <br />Data submitted to the Division tndicates~that inflows could be expected <br />up i>z l25 gallons per minute. However, this i~,s data from one hate and it's <br />not, cannot De precisely determined. I think 'this is an estimate the: we are <br />using t:0 go with, Based on this information, the Division does feel that the <br />-_ slurry, wall would be necessary xA ensure that,ifirst of P, the hydrologic - <br />balance of the alluvium material would not be Materially disrupted at post <br />mining and that during mining, the opera ti an wQuid remain essentially dry. <br />Battle Mountain Resources has submitted a typi4al slurry wa11 design, the <br />exact spe^_ifications of file design have not been submitted and wi11 oat be <br />sutmitted until the actual need for the trench~is determined mr the slurry <br />wall is determined. <br />We will determine the necessal for this Murry wall about tyro years <br />after an excavation 1s completed. This excavation would essentially oe a <br />Lrench in the alluvial materials in the vicinity of the south wall of the West <br />lit. [C's felt by the Staff, Drat Lhis would bg the best method to determine <br />tiVie necessity and to determine the actual infloir rate and volumes, if any, <br />into the pit area. With that in mind, the Company has committed to <br />1 <br />'I <br />