Exhibit L <br />• After direct costs aze estimated, they are totaled (subtotal) and indirect overhead costs are <br />added as follows: <br />a, Insurance, Bonding, Contractor's Profit 12.5% <br />b, Engineering and Administration 5.0% <br />Reclamation of the plant and railroad spur will occur within 12 to 24 months of the <br />exhaustion of the resource or the end of the economic life of the facility. <br /> <br />I • <br />AppExhibitsA-T-APPQ 180)AevB/January 17, 2002 - L.-3 <br />