My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72345
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:54 PM
Creation date
11/21/2007 12:14:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
1/18/2002
Doc Name
Permit Application
From
GCC Rio Grande Inc
To
DMG
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clinker cooler. <br />Clinker vent <br />Bucket conveyor <br />100,000 ton clinker silo <br />Unburned clinker silo <br />Bucket conveyor <br />Gypsum receiving hopper <br />3,000 ton gypsum storage <br />Finish mill feed bins <br />Cement grinding <br />Air slide conveyor <br />10,000 ton cement storage <br />Truck and rail loadout <br />Cement bucket conveyor <br />Clinker and gypsum bucket conveyor <br />Raw recycle bin <br />Limestone feed transfer point <br />Reclamation of the cement plant will require dismantling and removing conveyors, <br />grinding mills, storage facilities, kiln, office building, railroad loadout, and other support <br />structures such as pazking lots, fencing, and concrete floors, foundations and footings. <br />For the bond calculation, all demolition materials (asphalt, concrete, steel, equipment, <br />and superstructure materials) will be disposed of off-site. Plant azeas will be graded to <br />blend in with the surrounding topography before topsoiling and seeding. <br />The railroad spur is estimated to be approximately 20,000 ft long. The bond estimate is <br />based on removing the rail and ballast from the site, followed by grading to blend in with <br />the surrounding topography. These areas will be covered with topsoil (salvaged and <br />stockpiled during construction), and seeded with the prescribed seed mix. <br />Consistent with Rio Grande's Air Quality Permit, The surface mine will be reclaimed <br />concurrently with mining, so that no more than approximately 30 acres (less than 15.5 <br />acres subject to wind erosion) should be unreclaimed at any given time. In addition, <br />approximately 40 acres of other disturbed azeas for roads, conveyor corridors, and other <br />facilities are assumed for these calculations. Grading includes smoothing final highwalls <br />to no steeper than 4H:1 V and establishing drainage. Reclamation of the surface mine will <br />also requite dismantling and removing the crusher and conveyors before grading, <br />topsoiling, and seeding. <br />The access road and the bridge over the St. Chazles River are assumed to be acceptable <br />improvements that will be taken over by the. landowner, and therefore no reclamation is <br />anticipated. <br />AppEx6ibilsA-T-APPQ780)Aev87January 17,2002 L-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.