My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72187
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:42 PM
Creation date
11/21/2007 12:09:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/26/2005
Section_Exhibit Name
Rule 3 Performance Bond Requirements
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 4.05.14 Transfer of Wells <br />Colowyo does not plan to transfer any monitoring wells to water wells. <br />The l3 permitted and bonded wells (11 monitoring and 2 potable) include TC-I, TC-3, <br />North Goodspring Well, A-6 Well, A-3 Well, Gossard #I Well, 5 Streeter Fill Wells <br />(W6900S, W6900N, W6700 and two collapsed piezometer wells), Sec[ion 16 Fill well, <br />and the West Pit Fill well. <br />4.0.15 Water Rights and Replacement <br />Colowyo, if necessary, will replace the water supply of any owner of interest in real estate <br />who obtains all or part of a supply of water for domestic, agricultural, industrial or other <br />legitimate use from an underground or surface source where the water supply has been <br />affected by the mining operation. <br />Colowyo does not anticipate that any water supply or water right of any owner of interest will <br />be affected by the mining operation. Detailed information on the Colowyo augmentation plan <br />is set forth in the Hydrology Information Exhibit (Exhibit 7). <br />4.05.16 Discharge of Water into an Underground Mine <br />No surface water will be diverted into any underground mine workings. <br />• 4.05.17 Post-mining and Rehabilitation of Sedimentation Ponds, Diversions. <br />Impoundments, and Treatment Facilities <br />No treatment facilities are planned. Approved permanent sedimentation ponds, stock ponds, <br />and permanent diversions will be left in place. These structures will be maintained in an <br />appropriate condition before the Permit area is abandoned by repairing any necessary <br />portions, cleaning sediment and debris out, establishing appropriate vegetation and providing <br />soil stabilization. <br />4.05.18 Stream Buffer Zones <br />Stream buffer zones have been identified along Goodspring Creek and Taylor Creek and, <br />where necessary, have been posted with stream buffer zone signs. <br />• <br />4.05-16 Revision Date: 3/21/01 <br />Revision No.: TR-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.