Laserfiche WebLink
• 4.0>.I Z Protection of Groundwater Recharge Capacity <br />The reclamation plan as described in 2.05.4 will return the disturbed lands to approximately <br />the pre-mining condition; therefore, ground water recharge capacity is expected to <br />approximate the premining condition. Also, because of the minimal existence of ground <br />water in the mining area, the mining operation and subsequent reclamation should have no <br />adverse effect on the existing ground water recharge capacities. <br />• <br /> <br />4.05-9a Revision Date: 6/25/02 <br />Revision No.: TR-55 <br />