My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72187
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:42 PM
Creation date
11/21/2007 12:09:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/26/2005
Section_Exhibit Name
Rule 3 Performance Bond Requirements
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.03.3 Light-Use Roads <br />The location of light-use roads will be determined on the basis of the progress of the mining <br />operation and specific design and environmental considerations. Typical light-use roads will <br />be "access" roads of recent construction in the pit areas for blasting and maintenance, <br />exploration roads, and reclamation access roads. <br />Light-use roads, whether in the pit or other areas, will be constructed using the best <br />technology currently available, to the extent possible, to avoid damage to fish, wildlife, and <br />related environmental values and to prevent additional contribution of suspended solids to <br />runoff outside the permit area. Roads in the pit areas will be constructed on an already <br />disturbed material. Reclamation access roads and exploration roads will be restored <br />immediately after they are no longer needed. Information contained in Section 2.05.6 reveals <br />that no fish and wildlife damage will result from mining operations, including the <br />construction or operation of light-use roads. <br />All light-use roads will be completely removed, regraded, and revegetated when they are no <br />longer needed for operations, reclamation or monitoring. The light-use roads will be used by <br />pick-ups, light-duty service trucks, track-mounted overburden drilling rigs and tractors. <br />The location of the light-use roads will be determined largely by the immediate need of the <br />mining operations. They will not be located in the channel of any major drainage unless <br />specifically approved by the Division. <br />Light-use road construction will generally require no topsoil removal. Roads in pit areas will <br />already have been pre-stripped of topsoil for mining and the construction of exploration roads <br />will only require removal of any large vegetation. <br />Light-use road maintenance will include maintaining natural drainages across the roadway <br />and periodic dozing to remove loose material which might contribute to sedimentation or <br />road instability. <br />A number of light use roads consist ofpre-existing ranch roads which existed prior to mining <br />activities and will be left in place after mining <br /> <br />4.03-3 Revision Date: 8/29/97 <br />Revision No.: TR-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.