My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72133
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:39 PM
Creation date
11/21/2007 12:08:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
Intro and Sections 1 thru 5 and 7 thru 8
Section_Exhibit Name
Volume VII Geotechnical Studies
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jim Stover <br />• J.E. Stover & Associates <br />September 9, 1997 <br />page 2 <br />Remedial Measures: We recommend that the slide mass be removed to undisturbed material and <br />the slope either be reconstructed to its original inclination or flattened. It may be necessary to <br />excavate further into the hillside before more competent material can be encountered to begin <br />the portal entrance. This may result in further sloughing. <br />If reconstruction of the slope to its original inclination is selected, it should be accomplished by <br />benching new fill into the slope. Benches should be constructed about every 8 feet in height and <br />should be at least 4 feet wide. Fill should be compacted to at least 90% of the modified Proctor <br />density at a moisture content within 2% of optimum moisture. <br />If the cut slope is flattened, it will probably require an inclination of approximately 1'l0:1 in <br />order to remove the slide mass. The excavated material could then be used as fill above the <br />multi-plate. <br />Portal Benclt Stabilit~Analysis: The original design conducted by Morrison-Knudsen consisted <br />of two benches, a portal bench and a coal stockpile bench, near the coal seam. Bowie Resources <br />• Limited decided to construct a single bench in this area. We have conducted a slope stability <br />analysis of the reconfigured bench fill slope at the request of the Division of Minerals and <br />Geology. The critical section extends from the portal through the hair-pin turn below the fill <br />slope. The subsurface conditions modeled consisted of compacted fill overlying native soil (CL- <br />GC, as described in our previous reports) which was overlying shale and sandstone bedrock. <br />The material strengths presented below were determined by laboratory testing conducted during <br />our previous studies. The strength parameters for the compacted fill were determined from <br />samples compacted at 85 to 90 percent of the maximum density obtained from modified Proctor <br />criteria (ASTM D-1557). Fill placed during construction was compacted to 95 percent of the <br />maximum density as determined by modifed Proctor criteria. Based on this information, we <br />believe the strength parameters of the fill and hence, the results of the stability analysis to be <br />conservative. The following tabulates the parameters modeled in the analysis. <br />Material Compacted Fill Native Soil (CL- <br />GC) Bedrock <br />Total Unit Weight 125 pcf 125 pcf 125 pcf <br />Angle of Internal Friction 0 degrees 0 degrees 0 degrees <br />Cohesion 2,000 psf to 3,000 psf 4,000 psf 5,000 psf <br />• <br />-rR-o ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.