My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72133
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:39 PM
Creation date
11/21/2007 12:08:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
Intro and Sections 1 thru 5 and 7 thru 8
Section_Exhibit Name
Volume VII Geotechnical Studies
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />._~ <br />PURPOSE AND SCOPE OF STUDY <br />This report presents the results of a preliminary geotechnical engineering study to <br />determine the general subsurface conditions for the proposed surface facilities at the proposed <br />Bowie No. 2 Mine, located in Sections 10 (SWl/4) and 15 (N1/2), Township 13 South, Range <br />91 West of the 6th Principal Meridian, Delta County, Colorado. The study was prepared in <br />accordance with our proposal, dated May 21, 1996. The project site is shown on Fig. 1. The <br />study was conducted for the purpose of evaluating geotechnically-related issues pertaining to site <br />development and to provide recommendations for design and construction. <br />A field exploration program consisting of 23 exploratory borings was conducted to obtain <br />information on subsurface conditions. Samples of the soil and rock obtained during the field <br />exploration were tested in the laboratory to determine physical and engineering characteristics. <br />Results of the field exploration and laboratory testing were analyzed to develop the <br />recommendations contained herein. This report has been prepared to summarize the data <br />obtained during this study and to present our conclusions and recommendations based on the <br />proposed construction and the subsurface conditions encountered. Design parameters and a <br />discussion of geotechnical engineering considerations related to planning and development are <br />included in the report. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.