Laserfiche WebLink
<br />' BdcB Excavating, /nc. -Montgomery Gravel Pit Starmwater Management Plan Page 11 <br />G...:..II1~LPI:OYEE TRAINING <br />' B&B Excavating, Inc., through the Safety Coordinator, will develop a training program to <br />educate current and new employees on appropriate spill response, good housekeeping and <br />materials storage practices. <br />,. ,. <br />;H::. .TESTING: FOR NON=STORMVPATER DISCHARGES <br />There are no non-stormwater discharges known to be present at this site. An on-site septic <br />' system disposes of sanitary waste via subsurface discharge. Therefore, no testing for illicit <br />connections or other non-stormwater discharges is proposed. <br /> <br />1 <br />1 <br /> <br />1 <br />1 <br /> <br /> <br />;.. . <br />.: ...... :...:..: :.::.... SECTION 4: : ;':: :.::. ,:::::.. '. ...:.:.:..' :.::: ; <br />... <br />:............ <br />:... :::. .: :::...:.COMPREHENSIVE INSPECTION;.:::: >.::..: ;:::. :..: ;:::. <br />The SWMP administrator, will conduct regular inspections of the site for spill controi, waste <br />management, maintenance, and cleanup as described in this control plan. A qualified environ- <br />mental engineering consultant shall be retained to obtain stormwater samples as required by <br />CDOIi regulations. Records of inspections shall be made on the attached forms (Appendix 2) <br />and maintained in files at the site. <br />,.. . <br />RECORD. KEEPING AND INTERNAL; REPORTING, PROCEDURE . . <br />Incidents such as spills or other discharges, together with other relevant information describing <br />the quality/quantity of stormwater will be included in records maintained at the site. Inspection <br />records (discussed in Section 4, above) and maintenance records will be maintained at the site. <br />