Laserfiche WebLink
<br />BdcB Exrnt+ating, Inc. -Montgomery Gra~+e! Pit Starnrwater Managtmem Plan <br /> <br /> <br /> <br /> <br />Total Phosphorus Low Low <br />Total Dissolved Solids Low Low <br />Total Suspended Solids <br /> <br />1 <br /> <br /> <br /> <br /> <br />1 <br />1 <br />1 <br />(Outside Range 6.5 to 9.0) <br />Low I Low <br />Low ~ Low <br />C~:.:.:PREVENTATIVE MAINTENANCE . <br />Page 8 <br />These are the inspection and maintenance practices that will be implemented to control <br />stormwater runoff quality: <br />• All control measures will be inspected at least once each week and following any storm <br />event of 0.5 inches or greater. <br />• All measures will be maintained in good working order if a repair or cleaning is <br />necessary, it will be initiated within 24 hours of report. <br />• The Safety Coordinator will be responsible for inspections, maintenance, and oversight <br />of repair operations. <br />,..:.. <br />D::.:..;;.: ;.GOOD : HOII$EB.EEPING <br />The following good housekeeping practices will be employed at the site: <br />• Substances stored on-site will be stored in a neat, orderly manner in their appropriate <br />containers, and, if possible, under a roof or other enclosure. <br />• The Safety Coordinator is responsible for day-to-day site operations and directing spill <br />prevention, cleanup, and reporting. <br />