Laserfiche WebLink
<br />4,) The as built weir approximates the design dimensions as <br />shown ,in the Appendix. Per conversation with Bob Weaver, <br />the structure is reported to be reinforced. Field measur- <br />ments are for the exposed sections of the weir only. <br />5.) The four (4) inch drain pipe is installed and appears <br />to be functional. Both ends are clear and some evidence <br />of discharge was present in the riprapped area. <br />6.) Due to the reported presence of F.M. Fox personnel <br />during construction, no effort was made to verify the <br />use of 8 inch fill lifts compacted to 90~ of the maximum <br />dry density. <br />7.) All fill outslopes appear to be successfully revegetated <br />with grasses. <br />In summary. the sedimentation pond appears to be built <br />according to the design specifications and in a workmanlike <br />manner. <br />Mincon Inc. appreciates this opportunity to work with Fox <br />Consultants on this project. We would be pleased to discuss <br />this report with you at your convenience. <br />Sincerely. <br />Mincon Inc. P.C. <br />~~~~ ~ <br />William P. Balaz P.E. <br />President <br />(2 ) <br />