Laserfiche WebLink
<br /> <br />6) In the event that groundwater or surface water is intercepted or disturbed by mining operations, <br />the mine operator will take all necessary steps to allow the flow to return to Howard Creek <br />drainage in as a direct course possible. The theoretical intercepted flow would not be diverted <br />to another drainage or collected in large volume (pond construction). With the exception of <br />small sediment control ponds, water will not be impounded for permanent or other use. <br />7) Please note the revised Reclamation Plan Map included in this mailing. <br />8) Please find proof of publication and neighboring land owner notices. <br />9) Please find proof of recordation of all additions and changes with the Fremont Counry Clerk and <br />Recorder's office. <br />Very Truly Yours, <br />~~....~c~~l <br />Kenneth S. Klco <br />Consulting Geologist <br />