My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71827
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:21:17 PM
Creation date
11/20/2007 11:58:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
3/18/1991
Doc Name
1990 Annual Hydrologic Report
Section_Exhibit Name
Appendix W 1990 Report Section 2.5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• monitoring the site on March 6. A no flow period from mid-June to <br />August was observed. The recorder stopped from August until mid= <br />October. During October and November there were periods of flow.. <br />although most of this period has no flow as well. <br />NPDES site 002 (No Name Gulch) recorded a high flow of 664.2 <br />gpm and overall average flow of 164.7 gpm during the period shown <br />in Figure C-3. The high flow observed from No Name Gulch was most <br />likely due to snow melt or a D-pit pumping during the last part of <br />February and the first part of March. Discharges varied throughout <br />the period, as Figure C-3 shows some of the variability can be <br />attributed to the precipitation events over the period. <br />Figure C-4 presents flow versus days for NPDES Site 003 (East <br />• Buzzard Gulch). Maximum flow of 825.1 was recorded in mid-July and <br />an average flow for the season 16.9 gpm. This maximum flow was <br />most likely due to C-pit pumping during July. Data was not <br />collected at site 003 before mid-July. 1990. Periods of no flow <br />occurred in late July through mid-August and through most of <br />October. <br />NPDES site 005 (Coyote Dam) only had a brief recording period <br />for the 1990 mining year. Figure C-5 presents the results of this <br />2 week period. The maximum flow was found to be 1768.1 gpm for <br />this period while the average flow of 859.9 gpm. <br />NPDES site 006 recorded a high flow of 13.4 gpm during the <br />1990 mine year. No flows were recorded from mid-June to mid- <br />August where the record stops, Figure C-6 presents the flows <br />versus time for NPDES 006. Low flows dominate the plot with an <br />average flow during the period of 1.2 gpm. <br />4-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.