Laserfiche WebLink
• 13 • <br />EXHIBIT D <br />RECLAMATION PLAN <br />Concurrent reclamation will be completed; however, this reclamation will not be <br />completed untill approximately 1/3 of the pit has been mined. Topsoil will be spread <br />to a depth of at least 6". Fertilizer and mulch will also be added. Slopes on the <br />perimeter of the pit will be no less than a 3:1 and oversize rock will be buried at the toe <br />of the reclamation area. The pit itself shal be nearly flat. Fertilizer and seed shall be <br />broadcast and harrowed in. We propose to seed in the fall of the year in order to take <br />advantage of the fall and spring moisture, as Soil Conservation Service has also <br />suggested seeding after October 15th. Species to be seeded shall be Western <br />W:heatgrass, Galleta, and Indian Ricegrass at the rates proposed on the S.C.S. <br />worksheet. <br />