Laserfiche WebLink
-Flow measurement must be installed at all discharge points. <br />-A Materials Containment plan must be developed. <br />-The legal and facility contacts must be amended to reflect the <br />current individuals. <br />-No sampling records were available as construction had just <br />recently begun on the coal mine. Previous DMR's were submitted as <br />No Discharge. <br />-Soil erosion prevention practices shall be implemented. <br />-Authorization from the Oil and Gas Conservation Commission shall <br />be obtained if water from the nearby coal degassification wells is <br />used for dust suppression on the roads. <br />-A Stormwater Permit has been obtained and assigned the CDPS No <br />COR-040202. <br />21 <br />Person(s) Interviewed: Ron Thompson <br />Title: Consultant <br />22. CDH Engineer/Tech:David Knope (719)545-4650 <br />