My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71655
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:57 PM
Creation date
11/20/2007 11:55:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Permit File
Doc Date
6/30/2004
Doc Name
Bond Calculation
From
CIRCES
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION permiUjob # : M-2004-025 <br />Task # : O6a State :Colorado <br />Date : 06/29/2004 County :Delta Abbreviation :none <br />Filename : M025-06a <br />User : SSS Site :North Fork-Pit <br />Agency or organization name :DMG <br />Permit or other job action :New 110c application <br />Task description :Rip phase 1 area except wetalnd <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Gab Shift basis : 1 per day <br />Attachment no. 2 :3-shank dpper <br />Data source : (CRG) <br />Cost Breakdown : Ownershi <br />Dozer operatin <br />Ripper operatin <br />Operat <br />Total un <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA <br />Area : 3.70 acres <br />Utilization <br />p cosUhour: <br />g cosUhour: <br />g cosUhour: <br />or cost/hour <br />it cosUhour <br />Selected estimating method : Area <br />Load factor : NA Bank volume : NA <br />BCY <br />Rip depth (ft) : 2.OD Volume : 11,939 BCY or CCY <br />Source of estimated quantity :3.7 acres ripped 2' deep <br />Source of estimated load factor :NA ,. <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feei/second <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feeUpass <br />Average ripping width : 7.08 feet/pass <br />Average ripping length : 500.00 feet/pass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time: 0.25 minutes/pass <br />Production per unit area : 0.822 acres/hour <br />Unadjusted production : 2,652.36 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unit cost : $0.070 per cu. yd. <br />$49.85 NA <br />$66.44 100 <br />$7.02 100 <br />$31.83 NA <br />$155.15 Total fleet cost/hour : $155.15 <br />• <br />Unadjusted production <br />per selected method : 2,652.36 cu. yds./hour <br />Site altitude : 5,600 feet <br />Altitude adjustment : 1,00 (Cat HB) <br />Jobeffciencyfactor: 0.83 (1 shiff/day) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production : 2,201.46 cu. yds./hour <br />Adjusted fleet production : 2,201.46 cu. yds /hour. <br />Total job time : 5.42 hours <br />Total job cost : $841 <br />
The URL can be used to link to this page
Your browser does not support the video tag.