My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71655
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:57 PM
Creation date
11/20/2007 11:55:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Permit File
Doc Date
6/30/2004
Doc Name
Bond Calculation
From
CIRCES
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : OSd <br />Date : 06/28/2004 <br />User: SSS <br />State :Colorado <br />County :Delta <br />Site :North Fork Pit <br />Agency or organization name :DMG <br />Permit or other job action :New 110c application <br />Task description :Create wetland bench area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.85 NA <br />Operating cosUhour : $66.44 100 <br />Ripper op. cosUhour : $1.40 20 <br />Operator cost/hour : $31.83 NA <br />Total unit cosUhour : $149.53 Total fleet cosUhour : $149.53 <br />;: <br /> <br />MATERIAL QUANTITIES <br />,. <br />Initial Swell Loose <br />volume : 1,936 LCY <br />factor: NA volume: 1,936 LCY <br />Source of estimated volume :.4 acres at avg. 3'grade depth <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Clay -Natural bed <br />0.00 % (I <br />5,600 feet <br />2,800 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Adjusted unit production <br />Adjusted fleet production <br />551.02 <br />551.02 <br />(avg.) <br />(1 shift/day) <br />(fnd-m(J <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.51 Hours <br />Unit cost : $0.271 /LCY Total job cost : $525 <br />Permit/jab# : M-2004-025 <br />Abbreviation :none <br />Filename : M025-05a <br />
The URL can be used to link to this page
Your browser does not support the video tag.