My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71655
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:57 PM
Creation date
11/20/2007 11:55:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Permit File
Doc Date
6/30/2004
Doc Name
Bond Calculation
From
CIRCES
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIf1CAT10N <br />Task # : 03a <br />Date : 06/28/2004 <br />User : SSS <br />County :Delta <br />Site :North Fork Pit <br />Agency or organization name :OMG <br />Permit or other job action :New 110c <br />Task description :$pfead <br />HOURLY EQUIPMENT COST <br />and comoact fill <br />Basic machine :Cat 08R Series 11 - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment nc. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership costlhour : $49.85 NA <br />Operating cosuhour : $66.44 100 <br />Ripper op.cosuhour : $0.00 0 <br />Operator cosuhour : $31.83 NA <br />Total unit cosuhour : $148.12 Total fleet cosuhour : $148.12 <br /> <br /> <br />MATERIAL QUANTITIES _.... <br />Initial Swell Loose <br />volume : 89,704 LCY factor : NA volume : 89,704 LCY <br />Source of estimated volume :Volume of loose material to fill (compacted) into hale 1 @ 15' depth <br />Source of estimated swell factor : NA <br />;:. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (F <br />Average site altitude : 5,600 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomoosed rock - 50% Rock. 50% Earth <br />Operator skill <br />Material wnsistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />1.00 ~ (S/SU/U) <br />0.47 <br />663.30 LCY/hr <br />663.30 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 135.24 Hours <br />Unit cost : $0.223 /LCY Total job cost : $20,032 <br />State :Colorado <br />Permiujob# : M-2004-025 <br />Abbreviation :none <br />Filename : M025-03a <br />
The URL can be used to link to this page
Your browser does not support the video tag.