My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71655
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:57 PM
Creation date
11/20/2007 11:55:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Permit File
Doc Date
6/30/2004
Doc Name
Bond Calculation
From
CIRCES
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Agency or organization name : DMG <br />Task#: 02a State :Colorado <br />Date: 08282004 County:De/fa <br />User SSS Site :North Fork <br />Permit or other job action :New 1 fOC appl <br />Task description :Import fill to <br /> Source <br />Exchange time (min.) : 0.50 (Cat HB) <br />Load time (min.) : 2.50 (Cat HB) <br />Haul time (min.) : 20.00 (milmph)x60 <br />Dump time (min.) : 0.90 (Cat HB) <br />Return time (min.) : 13.33 (mi/mph)x60 <br />Model: Generic 15-18 cy, 6x4 Shift basis : 1 per day <br />Cost Breakdown ~ Job utilization % Horsepower : 330 <br />Ownerehip wst/hour: $26.38 Nq <br />Operating cosUhoun $30.22 100 Weight (UST): 10.51 <br />Operetor cost/hour: $21.72 NA Cost data source: (CRG) <br />Total unit coSUhour: $78.37 Total Fleel cost/trour: 5783.10 <br />~ <br />MATERIAL OUANTITIE~ ~ ~~ ~ ~ - ~. <br />initial Swell <br />Loose <br />volume: 74,897 CCV factor. 1.765 volume: 87,2$S LCY <br />Source of quantity take-0ft :Volume to fill 3.2 acres to 75 faof depth (minus 2949c y from Phase 2) <br />Source of estimated swell factor CAT Handbook <br />Material purchase cost: $0.00 ACY Total cost: SO <br />HOURLY PRODUCTION -- - ~. •~ <br />Haul'nc CaoaciN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight: 2,900 pounds/LCY Struck volume: 15.00 LCY <br />Material tlescriDtion : <br /> <br />Decomposed rock-50%ROCk <br />50%Earth Heaped volume : 78.00 LGY <br />, Average volume: 78.50 LCY <br />Rated payload : 83,980 pounds <br />Paytoatl capacity: 22.08 LCY Adjusted volume: TS.SO LCY <br />Truck C le TI e <br />15.00 mile haul trip at: 45.0 mph (avg.)= <br />YO.00 mile return trip of : 45.0 mph (avg.) _ <br />Job Condition Correction Factors <br />Average site altitude <br />Altitude adjustment factor: <br />Job efficiency factor <br />Net job correction : 0.83 <br />Fleet size: 10 Tmck(s) <br />Permitfjob # : M•2004025 <br />Abbreviation :none <br />Filename :M025-02a <br />of Phase 1 M 2feetahove <br />Total cyGe time: 37.23 minutes <br />Unadjusted unit production : 26.59 LCY/Hour <br />Adjusted unit production : 22.07 LCY/Hour <br />Adjusted Fleet production : 220.69 LCVlHour <br />Totaljob time: 395.37 Hours <br />Unit cost $3548 /LCY Totaijob cost: 5309,618 <br />
The URL can be used to link to this page
Your browser does not support the video tag.