My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71530
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:49 PM
Creation date
11/20/2007 11:53:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981229
IBM Index Class Name
Permit File
Doc Date
6/20/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ 1 •i. ` <br />• <br />RECLAMATION LOST SUMMARY tont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No. Task Description Cost (f) <br />-------- I ------------------------------------------- I -------- <br />NA - no such work required <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description I Cost (f) <br />------ I ---------------------------------------------- I ---------- <br />NA - no such work required I <br />I I <br />I I <br />I i <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description <br />--------I-------------------------------------------- <br />I <br />5 Demolition Assume 10'*10'*5'mass @ 50.18/cf <br />6a 8 fib Seeding Per attached worksheets <br />Fencing NA - no such work required <br />7 Mob/Demob Per attached worksheet <br />Cost (S) <br />590 <br />519.950 <br />52.515 <br />Subtotal (M): 522.555 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 540.703 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFlT <br />Item No.l Item Description Cost (f) <br />---------- <br />-------I <br />1. ---------------------------------- <br />Public Liability Insurance.... ----------------I- <br />1.550% of dir. 5631 <br />2. Contractor's Performance Bond 0.975% of dir. 5397 <br />3. Contractor's Profit........... 10.00% of dir. 54,070 <br />4. Job Superintendent..Per attached task#8 worksheet) 51.848 <br />Subtotal (A): 56.946 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 547.649 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description I Cost (S) <br />-------I--------------------------------------------------I----------- <br />i i <br />1: I Minerals Program Admin. Fee at S.OOX of cnt r.l f2, 382 <br />NET INDIRECT COST PERCENTAGE: 22.92% Subtotal (B ): 52.382 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 59.328 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 550,032 <br />
The URL can be used to link to this page
Your browser does not support the video tag.