Laserfiche WebLink
...-. <br />r <br /> <br />RECLAMATION COST SUMMARY cont'd <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No. Task Description <br />-------- I ------------------------------- <br />NA - no such work required <br />I <br />I <br />I <br /> <br />sheet 3 of 4 <br />I Cost (f) <br />I <br />I <br />I <br />I <br />Subtotal (H): <br />I. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description Cost (f) <br />NA - no such work required <br />Subtotal (I): <br />J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No. Task Description Cost (f) <br />-------I----------------------------------------------I------------ <br />4a Replace topsoil over pit floor 8 slopes I 58.242 <br />4b Replace topsoil over abandoned haul road segment I f607 <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I i <br />I i <br />I I <br />I I <br />I I <br />I I <br />I i <br />Subtotal (J): f8.849 <br />