My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71530
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:49 PM
Creation date
11/20/2007 11:53:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981229
IBM Index Class Name
Permit File
Doc Date
6/20/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--, <br />FLATBED TRUCK COST DATA WORKSHEET tont'd Sheet 2 of 2 sheets <br />OPERATOR NAGES <br /> Fringe F. I.C.A Unempl. Wk. Camp. ~ <br />Labor Classification Zone Designation Base Rate Benefits (0.07707 (0.062) (0. 125) To tal ~ <br />Multi~pu rpose Truck Driver Zone 1 513. 54 53.49 51.04 50.84 51 .69 520 .60 ~ <br />Zone 2 514. 04 63.49 61.08 s0.E1 31 .76 621 .24 ~ <br />I <br /> <br />Hechanic Zone 1 <br />515. <br />22 <br />63.49 <br />51.11 <br />50.94 <br />51 <br />.90 <br />622 I <br />.73 ~ <br />Zone 2 515. 72 53.49 51.21 50.97 61 .97 523. 36 ~ <br />ACQUISITION LOST: <br />Base purchase price (CECG) 551 .145 .D0 <br />Less dealer discount (CECG @ 2.2X) 51 .125 .19 <br />Plus freight (assume 1.Sk) 5767 .16 <br />Plus dealer charges (assume .3X) 5153 .4; <br />Adjusted purchase price 550 .940 42 <br />Flus taxes: State sales @ 3X 51 ,528 .21 <br /> SMM @ 2X 51 .018. 81 <br />Less tire cost (CECG) S2 ', 966. 41 <br />Less salvage value (CECG @ 15X) 57 ,641. 06 <br />NET ACQUISIi70N COST ~ S42 .E79 97 <br />Shift Differential (S/hr) <br />Day shift: 50.00 <br />Swing shift: 50.30 <br />Graveyard shift: 50.45 <br />2 shift/day avg. 50.15 <br />3 shift/day avg. 50.25 <br />COST SUMMARY <br /> SINGLE SHIFT DOUBLE SHIFT TRIPLE SHIFT <br /> BAS15 BAS IS 6AS IS <br /> Zone 1 Zone 2 Zone 1 Zone 2 Zone 1 Zone 2 <br />Ownership Cost/Hr: 57. 46 57 .46 54.88 54.88 34.03 54.03 <br />Operating~ Overhaul Cost/Hr: 510. 98 111 .03 510.98 511.03 510.98 511.03 <br />Operator Cost/Hr: 520. 60 (21. 24 120.75 521.39 520.85 521.49 <br /> TOTAL COST/HR 539. 04 539. 72 536.61 537.30 335.86 536.54 <br />WORKSHEET FILENAME: MDFLATBD. W1(1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.