My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE71450
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE71450
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:20:43 PM
Creation date
11/20/2007 11:51:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984076
IBM Index Class Name
Permit File
Doc Date
6/20/1984
Doc Name
DDD OPERATION FN M-84-076
From
ROBINSON BRICK CO
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />June 26, 1984 <br />Mr. hfark Loye <br />Page 4 <br />Different soils boundaries as indicated in htr Puga's Exhibits <br />A-1 and A-2 have been transposed to our topographic maps and <br />are enclosed with this report as Soil Map Exhibits I-lA and <br />I-1B. A description of soils type S was not included with the <br />original application. A copy of that description is enclosed. <br />EXHIBIT L <br />1. Note my new list of costs in item 8 below. <br />2. I will use your cost figure of $38/acre for the seeding mixture. <br />3. I will use your cost figure of $200/ton for mulch. <br />4. Although I feel the costs of ~i0/cubic yard and $1.00/cubic <br />yard for backfilling and respreading topsoil, respectively, <br />are excessively high when compared to our actual costs (as <br />used in the original application), I will use your cost <br />figures. <br />S. The costs of $110/acre was for the equipment and labor cost to <br />disc, drill the seed and fertilizer mulch and crimp. I will <br />use your figures to recalculate these items. <br />6. As stated before, there will not be more than 20,000 cubic yards <br />of material to backfill. Although 30 acres could be disturbed, <br />backfilling would only be required in a portion of that acreage. <br />7. Respreading of topsoil is also an ongoing process. At no time <br />will there be more than 20 acres requiring the spreading of <br />topsoil; this is approximately 25,000 cubic yards. <br />8. Reclamation costs are as follows: <br />Backfilling 20,000 cu.yds. @ $.60 $12,000.00 <br />Topsoiling 25,000 cu.yds. @ $1.00 25,000.00 <br />Drilling of 35 acres 982.00 <br />Drilling of 35 acres 259.00 <br />Mulching of 35 acres 750.00 <br />Crimping of 35 acres 982.00 <br />Mobilization and demobilization 256.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.