Laserfiche WebLink
Section 771.23 (c). <br />• (c) All technical data submitted in the application shall be accom- <br />panied by-- <br />(1) Names of persons or organizations which collected and analyzed <br />such data; <br />(2) Dates of the collection and analyses; and <br />(3) Descriptions of methodology used to collect and analyze the data. <br />An enormous effort by many technical personnel and professional <br />organizations was undertaken in the preparation of this applica- <br />tion. Signigicant time, expense and man-hours have been devoted to <br />the collection, analysis and organization of the technical data <br />submitted in this permit application. Following are the personnel <br />by organization, who collected, analyzed, and/or assisted in the <br />development of the technical data and other information contained <br />in this application. Additionally, in those parts of this appli- <br />cation where technical data is presented the personnel directly <br />. responsible for its collection and analysis are specifically <br />identified together with the dates of collection and analysis and <br />the methodologies used. <br />ENERGY FUELS <br />Gerald Grandey Vice President of Legal Affairs <br />Alan Czarnowsky Manager of Engineering and Environmental <br /> Compliance <br />Kent Crofts Reclamation and Environmental Coordinator <br />Barry Denton Landman <br />Pam Ellison Blasting Technician <br />Jim Evans Surveyor <br />Steven Florquist Assistant Mine Engineer <br />Jayne Gall Secretary <br />John Gates, P.E. Chief Civil Engineer <br />Sames Griffin Chief Field Engineer <br />Tom Hancock Draftsman <br />• Ron Hamagami Mine Engineer <br />771-2 <br />