My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-30_PERMIT FILE - M2003030 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2003030
>
2003-04-30_PERMIT FILE - M2003030 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:58:58 PM
Creation date
11/20/2007 11:47:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003030
IBM Index Class Name
Permit File
Doc Date
4/30/2003
Doc Name
Permit Application
From
Joseph L. Dorris
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AFFECTED AREAS <br />Planned operation sites are listed below and tied in to corner No. 1 for affected claims. <br />Private lands indicated on the Hackett Mountain topographical map neaz Qui-Buc No. 8 are not <br />affected by this mining proposal. No operations other than prospecting are planned for Qui-Buc No. 8, <br />Qui-$uc No. 3, and Cut Dog mining claims at this time under this permit application. <br />SMOKY HAWK <br />SITE A: Scheduled for excavation 2003 to 2005. Center of excavation is located 1,47S linear feet at <br />heading 70° NE of comer No. 1 (190 linear feet at 220° SW from comer No. 3). <br />SITE C: Scheduled for excavation 2007 to 2009. Center of excavation is located 1,500 tineaz feet at <br />heading 80° NE of corner No. 1 (310 lineaz feet at 350° NW from corner No. 4). <br />ELK HORN <br />SITE B: Scheduled for excavation 2005 to 2007 (also extends about 20 feet onto Smoky Hawk). <br />Center of excavation is located 1,2001inear feet at heading 87° NE of corner No. 1 (2S0 linear feet at <br />273° NW of corner No. 4). <br />SITE D: Scheduled for excavation 2009 to 2011. Center of excavation is located 1,140 lineaz feet at <br />heading 81° NE of confer No. 1 (360 linear feet at 30S° NW of corner No. 4). <br />BLUE SMOKY <br />SITE E: Scheduled for excavation 2011 to 2013, <br />heading SO° NE of corner No. 1. <br />SITE F: Scheduled for excavation 2013 to 2015, <br />heading of 20° NE of corner No. 1. <br />Center of excavation is located SSO linear feet at <br />Center of excavation is located 4701ineaz feet at <br />WOLF FANG <br />SITE G; Scheduled for excavation 2015 to 2017. Center of excavation is located 1125 linear feet at <br />heading of 292° NW of corner No. I . <br />QUI-BUC N0.2 <br />SITE H: Scheduled for excavation 2017 and 2018. Center of excavation is located 37S linear feet at <br />heading of 50° NE ofcorner No. 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.