Laserfiche WebLink
3. Describe the measures to he taken for release of a reportable quantity of a hazardous material <br />or the release of a toxic suhstance. This inc]udes plans for spill prevention, containment, <br />notification, and cleanup. <br />,ij/o,~r ~,l/" b~ JS~o/ o/?,ri ~zay ij. ~ 2 itiov-e.. /loo ~-~-/cr: s,~ <-.~-// <br />H. Reclamation. Describc the annual and final reclamation standards based on the anticipated <br />schedule for construction, operations, and project closure. Include such items as the removal of <br />structures and facilities including bridges and culverts, a revegetation plan, permanent <br />containment of mute tailings, waste, or sludges which pose a threat of a release into the <br />environment, closing ponds and eliminating standing water, a final surface shaping plan, and <br />post operations monitoring and maintenance plans. <br />rvn,'/~z/ ~ln5e OiIT' Ul !/ pry/i/ i~ /rss ~Z ~.~ /C~'L, Sct ~eeF of+oil ~-o,^ <br />A~~C~ CL~A S.-:..; .~.~ih L.i, t<~ ~,< v.>i1~ ~ i,~n~'~ o` max- r~~`r~A; o..~d <br />V/. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br />A. Required changes/modifications/special mitigation for plan of operations: <br />(lf more space Is needed to fill aut a hlock of informatiai, use addikona! sheetx and a[tadi to jonn. ) <br /> <br />