Laserfiche WebLink
FROM BR~P.Z 3 RSSOCIRTES INC i-RX N0. : 970 263 9'35 Ian. 03 2001 0a:47PM P2 <br />Mr. Cregg Squiie <br />Pane 2 <br />Decetltbcr 30, 2000 <br />the operator will plant a vegetative barrier between the pits and the slough using cottonwoods and <br />willows. These trees will be planted on the southern edge of the fifty (50) feet barrier leil to <br />protect the slough from mining. The cottonwoods are expected to be 6 to 10 feet high and will be <br />planted on approximate 35 feet centers. The willows will be planted by cutting small branches <br />from live trees and planting these sprigs along the bank of the slough. The willow sprigs will be <br />on three (3) to live (5) feet centers. The operaror will plant the trees for the visual barrier as <br />mining starts in an area. The trees used for the visual barrier are expected to provide a basis for <br />infiltration of cottonwoods and willows into the reclaimed areas of the west property line to horse <br />fence and slough to east property line mining aeeas thereby complementing the trees planted <br />around the periphery of the ponds during reclamation. <br />item 4 -Impact of renewable resource mining on heron rookery. The operator intends on mining <br />the renewable resource area on an intermittent basis and only during low flow periods in the <br />Colorado River. The low flow period is generally expected to be between October 1 and March <br />31. However, the low (low period will vary depending on snow pack and weather conditions in <br />the drainage basin. As such the renewable resource azea operating schedule may vary from that <br />mentioned above if the water level in the Colorado River is low enough to allow safe mining in <br />the renewable resource area before or after the above mentioned dates. <br />After the initial mining of the renewable resource area, the frequency of mining will be determined <br />by the rate of rechazge and is expected to be variable ranging from as frequently as annually to as <br />low as once every five years. <br />The mirting of the renewable resource area in the fall and winter of the year is expected to have <br />mitlimal impact on the heron rookery as the nesting usually takes place in the spring and summer. <br />Item 5 -Native fish. The ponds aze incised anywhere from 15 to plus 30 feet. As such there is <br />not any easy w•ay to completely drain the ponds other than pumping. The operator is considering <br />x commitment to plant only salmonid species in the ponds to control the planting ofnon-native <br />fish species. This approach is being considered since the ponds in the west property line [o horse <br />fence, slough to east property line and Dry Creek ntutiug areas are in the 100 year floodplain and <br />are expected to be covered by one to four feet of water if these type of high flows occur. In these <br />high flow circumstances, outlet protection is iueffec,~tive and therefore is not considered. <br />Item 6- Public Access. The operator does not wish to consider this public access to the reclaimed <br />area at this time. <br />