Laserfiche WebLink
_ ,. <br />All.materials, egmpment, installahon,'construction, and design, including auxiliary lane: (s)-and the ;: <br />intersection improvements within state highway right-of-way, shall be in accordance with_the applicable <br />CDOT.and local jurisdictions standards. <br />1 Z. All work is to eonform to ahe plans referenced by this permit on file with the Department or as modified by <br />_. <br />this pemrit: (If discrepancies arise; this permit shall take precedence over,the.pTans:) .The Department or <br />'issuing autfiority.plan review i onlyfor genera] confoimanoe'with the Departrnent's. design and code <br />`requirements. The Department or issuing authority is not responsible for the accuracy and-adequacy of the <br />design; dimensions, elevations and other elements which, sfiall' be confirmed and.correlated at the work site. <br />,. <br />The Department, through the approval of this document, assumes no responsibility for the completeness or <br />accuracy of the plans. _ <br />18... Survey markers or monuiirents must be preserved in their original positions; Notify the Department at <br />303-757-9744 immediately upon damage to or discovery:of any such markers orinonuments at the work site:. <br />Any survey markers or monuments disturbed during execution of this permit shall be repaired and/or replaced <br />immediately at the expense: of the Permittee.: . . <br />19. Construction Plans must be approved by the Colorado Department of Transportation,. Region One, priorto the <br />_. <br />issuance of the Nofice to Ptoceed: ' `: <br />20. Signing and Striping Plans must be approved by the Colorado Department of Transportation, Region One, . <br />-prior to the issuance of the Noticeto Ptoceed. ' <br />21. 'Traffic Control Plans must be approved by the Colorado Department of'Fransportation, Region One, prior to <br />the issuance ofthe Notice to Proceed. <br />22. Upon completion of the work,'the Permittee/Contractor/6ngineer shall submit an "As Built" plan, showing in <br />detail.all.6onstruoiton changes, modifications and revisions.. A1lchanges; modifications'andrevrsions shall be <br />sealed and signed by a Colorado Registered Professional Engineer.: . <br />23. -Upon completion of the work, a letter.certifying that all project materials, construction, inspection and . <br />`workmanship was in accordance with the plans and applicable Department standards and specifications for . <br />Traffic Section, 18500 East Colfax•.4ve.~ Aurora; CO. 80011. The certification letter must be sealed and <br />signed by a Colorado registered professional engineer. - <br />_. <br />24. The Pemuttee must have available for review at the time of conditional acceptance, all documents relating to <br />•. construction (ie; plans; project correspondence; materials testing and'survey notes). <br />. 25: . In accordance with Secfion 2.5 (~ of the State HighwayAccessCode, final acceptance of the access- <br />improvements by CDOT, Region One; will be provided to the Permittee in writing two (2) years from the date <br />of construction completion:.:L`you have not received a final acceptance letter in thvo:yeazs, please contact the <br />`Region One Access Manager at 303-757-9123::. <br />25. It shall be the: responsibility cf the Pemutee to:verifythe location of the existing utilities and notify,ail n6lity <br />owners or: operators of any work thaYmight involve utilities within the State Highway right-of--way. Any work <br />necessary to protect existingpemritted utilities; such as an encasement will be the responsibility of the <br />