Laserfiche WebLink
<br />William & Kristi Lozier <br />Conger Harvesting Area <br />2 <br /> <br />April 22, 1998 <br />File No. M-98-022 <br />within DMG jurisdiction. The application includes a geologic study conducted by <br />Environmental Assessment Association which indicates that slope stability may be <br />enhanced by the proposed mining operation. DMG is reviewing the application, is familiar <br />with the site, but has not identified adequacy issues relating to slope stability. <br />Your stated concern that the proposed operation may continue for years is correct. The <br />Mine Plan indicates that the life of mine is ten (10) years. An approved operation may <br />continue as long as the operation remains in compliance with the Act, Rules and permit <br />conditions. <br />Please contact me at the DMG Durango Office, 484 Turner Drive, Building F, Suite 101, <br />Durango, CO 81301, phone (9701 247-5469, if you have any questions or require <br />additional information. <br />Sincerely, , <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />cc: William P. Balaz, Balaz & Associates <br />