Laserfiche WebLink
4. Conclusion <br />The July 9, 2004 quarterly sampling event fulfills the requirements of the DMG's second <br />adequacy review letter and the Groundwater Monitoring Plan (BBL, 2002) for four additional <br />quarters of goundwater monitoring at monitoring well MW-10. The July 9, 2004 goundwater <br />elevations are summarized in Table 1. The corresponding groundwater contour map is provided <br />as Figures 2. Groundwater quality data for MW-10 for this quarter aze summarized in Table 3. <br />Historical groundwater monitoring data for all locations aze provided in Appendix B. These <br />results aze being submitted to DMG for development of ambient groundwater quality criteria for <br />the Holcim groundwater monitoring program. <br />Respectfully submitted, <br />BLASLAND, BOU~K,& LEE, INC. <br />Christopher S. Peters, tsconsin PG 1054-013 <br />Vice President <br />C:\D000ments and Settings\cspVNy Documrn[s\MyDOC\Flolcim\portland\goundwater monitoringVuly 2004V08849999.doc 4_1 <br />