My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70705
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:58 PM
Creation date
11/20/2007 11:29:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
10/24/2005
Section_Exhibit Name
Section 2.0 General Description of the Mining Operation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2-28 <br />2.2.1 Buildings and Other Facilities <br />MINE SITE <br />One office trailer will be located on the mine bench. The 3MV substation is <br />supported by six concrete footers which are two feet wide. The 40' X 40' shop building <br />has been constructed with a concrete floor. A 2,000 gallon fuel storage tank has been <br />nested inside a catholically protected 4,000 gallon tank as a secondary containment. <br />The conveyor belt exits the mine and discharges into a crushing and screening <br />facility. This facility is comprised of a 7' X 16' double deck screen and a triple roll <br />crusher. The sized product from the crushing and screening facility is conveyed to a <br />coal stockpile by a 120-foot 36-inch radial stacker belt. The radial stacker wheels are <br />supported by a retaining wall and concrete runway. The foundation for the crushing <br />and screening facility is a concrete pad with wing walls. Figure 2.2-2 shows the location <br />of buildings and other facilities which area listed in Table 2.1-1. Figure 2.2-6 shows <br />buildings and other facilities located in the vicinity of the portal bench. During 1989, the <br />• Operator installed a bulk rockdust bin and a concrete footer for its support. <br />The 48-inch mine belt is supported by a channel/truss frame and extends <br />approximately 24 feet outby the portal where it discharges onto the screen deck. A 40- <br />foot long 48-inch conveyor collects sized coal from the screen and crusher and conveys <br />the product to the stacking belt. <br />• <br />M`Clane Volume 1 06/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.