Laserfiche WebLink
2-27 <br />Coal waste may be generated from the operation in the form of coal fines, roof <br />falls and other material (high-ash coaly material) scraped up from the coal yard area. <br />This material will be stored in the temporary pile adjacent to the coal product stockpile. <br />This material will be blended and shipped with the product when possible. Periodically, <br />the temporary coal waste pile will be hauled to the coal mine waste disposal facility in <br />the Munger Canyon Mine permit area that was approved by technical revision no. 14, <br />TR-14, during November, 2002. The Operator has approval from the Mine Safety and <br />Health Administration (MSHA) to dispose of non coal rock slope material in areas of the <br />mine that are_no longer_actively producing coal. _ _ -- - . -- - - <br />All non-coal waste generated is disposed of by a commercial waste disposal <br />company. The non-coal waste is typically stored in a dumpster which is periodically <br />hauled to a disposal facility by the waste disposal company. During periods when the <br />mine is idle, the limited amount of non-coal waste generated is sometimes collected <br />and hauled to a waste disposal facility by the Operator. <br />M`Clane Volume 1 08/03 <br />