Laserfiche WebLink
Following is an estimate of reGamation costs. Bear in mind that this estimate is based on today's cost and <br />is subject to inflation and economic fluctuations. Changes and revisions as a result of the review process <br />to the accompanying roGamation plan may also affeG the total cost. <br />20 ROAD GRAVEL PIT <br />Equipment: Dozer & Scraper Avg. Push Grade: 17% Avg. Push Distance: 35 ft <br />Avg. Haul Grode: 7 % Avg. Haul Distance: 500 R <br />ITEM DESCRIPTION UNIT QUAN. UNIT <br />PRICE TOTAL <br />1 Mobilization <45 mi. EA 4 $ 1,000.00 $ 4,000.00 <br />2 Dewatering DAY 45 200.00 9,000.00 <br />3 Embankmem CY 125,000 $ 3.00 375,000 <br />4 Place Top Soil CY 17,300 $ 1.50 25,950.00 <br />5 Type °A° Seed, <br />Mulch, and Tack Fertilize AC 6.4 300.00 1,920.00 <br />6 Type °B° Seed, <br />Mulch, and Tack Fertilize qC 8.6 450.00 3,870.00 <br />7 °Biosol" Fertilizer AC 15.0 385.00 5,775.00 <br />8 Abandon Wells Per State <br />En ineers Office ~ 3 500.00 1,500.00 <br /> Subtotal $427,015.00 <br />8 Indirect Costs LS 20,.000.00 <br /> Subtotal 447,015.00 <br />9 Project Management LS 15,000.00 <br /> TOTAL $462,015.00 <br />NOTE: <br />20,000 TONS OF CONCRETE RUBBLE IS INCLUDED WRHIN ITEM 3. HAUL AND PUSH DISTANCES FOR RUBBLE ARE <br />INDICATED ABOVE. <br />q., <br />. ~eceie2c; <br />Ji14~ 0 ~ 2~~~ <br />Grand Junction Fi_ ~ _;'icu <br />~evialon of Minarals :: t::~olu.~$' <br />Rev. 06/07!06 <br />