Laserfiche WebLink
<br />Mr. Bob Freitag <br />Page -5- <br />4. The hill appears steep. What measures will you provide to <br />prevent erosion and/or slope failure? <br />Exhibit C - Map <br />The included survey plat shows 7.2 acres, but the application <br />is for 5 acres. Why? Please outline the final pit and top- <br />soil stockpile on your map. <br />Exhibit F - Local Government Approval <br />You refer to an attached letter. This letter was not present <br />in your application. We still need this. <br />Exhibit G - Legal Right to Enter <br />Please send some evidence that you have the legal right to <br />enter. <br />80-10 Roberts Tunnel Dump <br />Exhibit A - Legal Description <br />Your legal description is confusing. The spot indicated <br />on the topographic map is the NEB of the NW14, Sec. 9. Please <br />clarify this. <br />Exhibit B - Mining Plan <br />1. What is the exact nature of the Roberts Tunnel Pit? Is this <br />an old mine site or water diversion tunnel? Is water involved <br />at this site? How: <br />2. Please submit a map similar to that requrested for Sulphur <br />Mountain Pit. <br />3. What measures will you take to prevent erosion? <br />Exhibit E - Reclamation Plan <br />You state that a plan is included with a lease from the Denver <br />Water Board. A lease copy was not included. In any event, <br />