My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70464
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:35 PM
Creation date
11/20/2007 11:22:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
1991 HYDROLOGIC MONITORING PROGRAM & Current Hydrologic Monitoring Program
Section_Exhibit Name
TAB 15 APPENDIX 15-3 & APPENDIX 15-3a
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 ~ ~~ • <br />Current Hydrologic Monitoring Program ~ ~ <br />Surface Nater <br />Monitorinc Freauencv <br />Site Number Discharge Water Quality Comments <br />SN-S2N•SGS Nonthly Monthly/Triannual <br />SN-S24•SC7 Nonthly Monthly/Triannual <br />SN-52N-FGf Continuous Monthly/Triannual <br />SN-52W-FG4 Continuous Monthly/Triannual <br />SN-52N-FGS Nonthly Monthly/Triannual <br />NPDES 005 Continuous Weekl ylTriannual Monitor per NPDES permit <br />NPDES 006 Continuous Weekly/Triannual Monitor per NPDES permit <br />NPDES 009 Continuous Weekly/Triannual Monitor per NPDES permit <br />Weekly = Weekly monitoring of NPDES sites consists of flow, temperature, pH, and electrical <br />conductivity. <br />Monthly = March-October only, monthly water quality consists of field parameters only <br />(pH, temperature, electrical conductivity). <br />Triannual = Vater quality samples (analyzed according to the surface water parameter long <br />list) are collected during the key hydrologic events of spring snowmelt, late spring-early <br />surtuner baseflow, and fall bas of low. <br />Continuous = Continuous flow monitoring except during the winter months when the stilling <br />wells and fl umes are frozen. <br />NOTE: for all springs (native), spoil springs, and stream sites, when sampling for the <br />surface water parameter long list is required and flow~is less than 5 gpm, only <br />field parameters will be measured. <br />Sorinas <br />Nonitarinu Freauencv <br />Site Number Discharge Vater Duality Comments <br />S-1 Semiannual Semiannual Semiannual = April/June, <br />S-5 ~ Semiannual Semiannual September/November <br />5-23 Semiannual Semiannual <br />5-41 Semiannual Semiannual <br />5-45 Semiannual ~ Semiannual <br />Pater samples will 6e analyzed according to the Surface Pater Parameter List <br />Spoil springs will be incorporated into the hydrologic monitoring program as [hey develop. <br />15-3-2 Revised 11/05/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.