Laserfiche WebLink
The entrance to this site will be from an existing road used for internal access by the <br />landowners. This road is their primary access to their land and it will remain after mining is <br />complete. This road is not included in the permit because it is an existing road that will <br />remain when reclamation is complete. <br />On-site equipment may include, but is not limited to, a motor grader, front-end <br />loaders, motor scrapers, a dozer, conveyors, a screening plant, dump trucks and a water <br />truck. Final processing may be done offsite depending on the need at a particulaz project <br />site. The material will be excavated with a dozer and placed in stockpiles for loadout using <br />a front-end loader. It may then be moved to a conveyor, screened and loaded out, or it may <br />just be loaded directly in trucks and hauled to a project site. <br />Little or no water will be used at the site. This material tends to pack down creating <br />a very stable surface that is not susceptible to erosion. If dust control water is used, it will <br />be obtained from sources the applicants have available. <br />