Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />-Flatbed Truck, 4x2, 30K GVW <br />Total <br />$53.79 <br />Fleet Size Haul Trip <br />;No. units) CosUhr/fleet <br />1 ~ $53.79 <br />Subtotals :~ $53.79 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average [ravel speed <br />Equipment Equipment <br />Haul time (hours) = 0.11 0.11 <br />Return time (hours) = 0.11 0.11 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.22 0.22 <br />Total non-roadable mob/demob cost' <br />' lwo rountl tops with haul rig <br />Total roadable mob/demob cost " <br />"one round trip, no haul rig <br />Return Trip <br />CosUhr/fleet <br />$53.79 <br />sheet 2 of 2 <br />$53.79 <br />Delta <br />5.0 miles <br />45.0 mph <br />$272.30 <br />$11.95 <br />JOB TIME AND COST Total job time : 2.44 hours <br />Total job cost : $284 <br />