Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task # : 06a State :Colorado <br />Date :08/10/2006 County :Delta <br />User : GRM Site :Wells Pit <br />sheet 1 of 2 <br />PermiUjob # : M-2006-027 <br />Abbreviation :none _ __ <br />Filename : M027-O6a <br />Permit or other job action :Initial Reclamation Liability Estimate <br />Task description :Secondary Seeding Mobilization <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cosUhour : $44.38 $46.13 $50.07 <br /> OperatorcosUhour: $27.66 $27.66 $27.66 <br /> Helper cosUhour : $0.00 $25.39 $25.39 <br /> Total UnitCosUhour: $88.67 $117.55 $125.45 <br />Nf1N-Rf1AflARI F FOl11PMFNT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhriunit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet DOT permit <br />Cost/fleet <br />-reveg tractor 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals :~ $113.67 $88.67 $0.00 <br />