Laserfiche WebLink
PART I <br />Page 11 <br />Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />3. Monitorine Requirements <br />In order to obtain an indication of [he probable comaLiance or <br />noncompliance with the effluent limitations specified in Part i.3.., <br />the oermittee shall monitor all effluent parameters ac the following <br />frequencies. <br />a) Active Mining Oucfall(s) <br />Effluent Parameter Measurement Freauencv ~ Samnle T~me di <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />pH, s.u. Weekly Grab <br />Oil and Grease, mg/I Weekly Visual <br />To cal Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />Settleable Solids, m1/1 g/ ,*fonthly Grab <br />Total Dissolved Solids, mg/1 J* Quarterly Grab <br />Total Phosphorus (as P), mg/1** Quarterly Grab <br />b) Post-Paining Oucfall(s) <br />Effluent Parameter Measurement Freauencv ~ Samole Twe 3/ <br />Flow, MGD Monthly Instantaneous <br /> or Continuous <br />Settleable Solids, ml/1 g/ Monthly Crab <br />Oil and Grease, mg/1 Monthly Visual e/ <br />pH, s.u. Monthly Grab <br />Total Dissolved Solids, mg/1 ~* Ouarterly Grab <br />To cal Phosphorus (as P), mg/1** Quarterly Grab <br />* Total Dissolved Solids (TDS) monitoring is required only for discharges to <br />the Colorado River Basin. See specific Facility certification rationale <br />to determine whether TDS monitoring is required. <br />** Toca1 phosphorus monitoring is required only for discharges co the Di1'_on <br />Reservoir drainage area (i.e.. Ten Mile Greek, Snake River, Blue River, <br />and all other tributaries to the Dillon Reservoir; ana for discharges to <br />the Upper Bear Creek drainage area. See specific Facility cercificacion <br />rationale co determine whether phosphorus aonitoring is required. <br />See Part I.B.4. for footnotes <br />