Laserfiche WebLink
<br /> <br />RESPONSE Continued (2.05.5) <br />There are no dams or embankments planned that will meet or ex- <br />ceed the size of other criteria of 4.05.6 (10). <br />All dams that do not meet the size or other criteria of <br />4.05.6(10) will be certified by either a qualified registered <br />professional engineer or a registered land surveyor, except that <br />all coal processing dams and embankments will be certified by a <br />qualified registered professional engineer. <br />EXCERPT FROM THE LAW <br />(8) Certification reports for all impoundments shall in- <br />' clude statements on: <br />(a) Existing and required monitoring procedures and <br />instrumentation; <br />(b) The design depth and elevation of any impounded <br />waters at the time of the initial certification <br />report or the average and maximum depths and ele- <br />vations of any impounded waters over the past year <br />for the annual certification reports; <br />(c) Existing storage capacity of the dam or embank- <br />ment; <br />C~ <br />