Laserfiche WebLink
• RESPONSE Continued (2.05.5) <br />Excavations that will impound water during or after the mining <br />operation will have perimeter slopes that are stable and will <br />not be steeper than 2v:lh. Where surface runoff enters the im- <br />poundment area, the side slope will be protected against ero- <br />sion. <br />EXCERPT FROM THE LAW <br />(4) Slope protection shall be provided to minimize surface <br />erosion at the site and sediment control measures shall <br />be required where necessary to reduce the sediment <br />leaving the site. <br />• <br />RESPONSE <br />Slope protection will be provided to minimize surface erosion at <br />the site and sediment control measures will be established where <br />necessary to reduce the sediment leaving the site. <br />EXCERPT FROM THE LAW <br />(5) All embankments of temporary and permanent impound- <br />ments, and the surrounding areas and diversion ditches <br />disturbed or created by construction, shall be graded, <br />fertilized, seeded, and mulched to comply with the re- <br />quirements of 4.15. Immediately after the embankment <br />is complete. Where water will be impounded, the active <br />