My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70173
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:17 PM
Creation date
11/20/2007 11:15:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Permit File
Doc Name
Slide Plan 10/4/90
Section_Exhibit Name
Reclamation Project Binder
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARCEL, MAURO, HULTIN & SPAANSTRA, P.G. <br />• Mr. Fred Banta <br />October 4, 1990 <br />Page 2 <br />Pit 4 Haul Road Stability Analysis. <br />Based upon ACZ's Pit 4 Haul Road Stability Study, Rockcastle <br />believes that the mass movement area associated with the Pit 4 haul <br />road is stable and conforms with the provisions of the CMLRD <br />Agreement. Rockcastle understands that CMLRD believes the best <br />professional judgment approach utilized in this study is <br />appropriate to determining stability of the mass movement features <br />associated with the Pit 4 haul road. As set forth more fully in - <br />the attached study, Rockcastle will: (1) install a rock toe drain <br />below the slide area of Pit 4; and, (2) divert cut slope drainage <br />above the slide area across the road. These reclamation measures <br />will enhance and maintain the stability of the potential slide area <br />and assure long-term use of the road. <br />Rockcastle requests that CMLRD review these studies as soon as <br />possible so that the specified reclamation activities set forth <br />above may be completed by the appropriate contractors before the <br />site becomes inaccessible due to winter weather conditions. <br />. Rockcastle has retained contractors to complete the foregoing <br />reclamation activities and informed them of the nature of the <br />proposed reclamation activities. Rockcastle will direct these <br />contractors to complete these reclamation activities as soon as <br />Rockcastle receives CMLRD approval. <br />Please contact me if you have any questions regarding the <br />content of this letter or the attached studies. We will also be <br />available at your convenience to discuss these issues more fully if <br />such additional discussion is necessary. Thank you for your <br />continued cooperation in this matter. , <br />Sincerely, <br />P CEL, MAURO, HULTIN & SPAANSTRA, P.C. <br />Brent C. Anders <br />ATTORNEYS FOR THE ROCKCASTLE COMPANY <br />BCA:bmc <br />Enclosure <br />cc: David J. MacDougall, Esq. <br />Mark Korb, Esq. <br />. Mr. Robert Sherman <br />Ms. Cathy Begej <br />Dean R. Massey, Esq. <br />
The URL can be used to link to this page
Your browser does not support the video tag.