My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70140
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:16 PM
Creation date
11/20/2007 11:13:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Approval of 110c Application
From
DMG
To
Charles Ponchak
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 009 <br />Date : 02/28/2006 <br />User : WHE <br />State :Colorado <br />County <br />Site <br />San Juan <br />Upper Animas Sand & Grave! <br />Permit/job # :M-2005-065 <br />Abbreviation :none <br />Filename : MO65-009 <br />Agency or organization name :DMG <br />Permit or otherjob action :110c application review <br />Task description :Prepare west bank for <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 307C Horsepower : 55 <br /> Weight (MT) : 6.49 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $13.66 NA Shift basis : 1 per day <br />Operating cost/hour : $14.01 100 Data source : (CRG) <br />OperatorcosUhour : $32.72 NA <br />Total unit cost/hour : $60.39 Total fleet cosUhour : $60.39 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 69 LCY factor : NA volume : 69 LCY <br />Source of estimated volume :Exhibit E-1. Reclamation Plan <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION - - -- <br />Excavator Cvcle Time (load bucket swing loaded, dump bucket, swing em <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.33 minutes <br />Bucket Cauacitv <br />Rated bucket capacity : 0.20 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity : 0.20 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 9,700 feet Altitude adjustment : 0.87 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shifUday) <br />Net job correction : 0.72 multiplier <br />Unadjusted hourly unit production : 36.00 LCY/hour <br />Adjusted hourly unit production : 26.00 LCY/hour <br />Adjusted hourly fleet production : 26.00 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 2,67 hours <br />Unit cost : $2.323 per LCY Total job cost : $161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.