My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70140
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:16 PM
Creation date
11/20/2007 11:13:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Approval of 110c Application
From
DMG
To
Charles Ponchak
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task#: 008 State: Cororado PermiVjob #: M-2005.065 <br />Date: 02/28/2006 County:San Juan Abbreviation :none <br />Site <br />Animas Sand & Gravel Filename : M065-008 <br />User WHE <br />Agency or organization name : DMG <br />Permit or otherjob action : 110c application review <br /> Task description :Carry 69.4 cy riprap to west bank location <br /> <br />HOURLY EQ UIPMENT COST Basic machine :CAT 9468 (2004) Horsepower : 702 <br /> Attachment no. 1 : ROPS Cab Shift basis : 7 per day <br /> Data source : (GRG) <br /> Utilization % <br /> Cost Breakdown : Ownership cost/hour : $13.47 NA <br /> Operating cosUhour : $7874 700 <br /> Operator cost/hour- 332.53 NA <br /> Total unit cost7hour : $64.13 Total Fleet cosUhoun $64.13 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 69 LCV factor NA volume: 69 LCY <br /> <br />Source of quantity take-off :Exhibit E7, Reclamation Plan Map <br />Source of estimated swell factor :NA <br />HOURLV PRODUCTION ~ (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material :Bank or broken material 0.040 (Cat HB) <br />Stockpile : Dumped by truck 0.020 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation: NO atljustment-factor not applicable 0.000 (Cat HB) <br />Dump target : Fragile target 0.050 (Cat HB) <br />Net cyGe time adjustment: 0.110 minutes <br />Adjusted basic cycle time: 0.585 minutes <br />Rollins Resistance -Road Contlitions <br />Haul :Loose sand <br />Retum :Loose sand or gravel <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Oata <br />Source <br />Haul route: 200 0.00 10.00 10.00 0.2251 (Cat HB) <br />Return route : 200 ~.0~ 10.00 70.00- ~ 0.2257 (Cat HB) <br /> Total travel time: 0.4502 minutes <br />Loader Bucket Caoacity Total cycle time : 1.035 minutes <br />Rated capacity: 1.50 LCY (heaped) <br />Burke! fill factor: 0.675 8lasfed rock -poorly blasted (60 - 75%) <br />Adjusted capacity: 1.01 LCY <br /> Source <br />Job Condition Correction Factors Altitude atljustment factor : 0.91 (Cat HB) <br />Site altitude: 9,700 feet Job efficiency factor: 0.83 (l shift/day) <br /> Net wrrection: 0.76 multiplier <br />Unadjusted hourly Unit production : 58.68 LCY/Hr <br />Adjusted hourly unit production : 44.32 LCY/Hr <br />Adjusted hourly fleet production : 44.32 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 7 Loader(s) Total job time : 1.57 Hours <br />Unit cost 51.447 /LCV Total job cost: $100 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.